Oil Pipeline Throughput — Enbridge Mainline, Trans Mountain and Keystone
Average daily volume each pipeline moved in a month, in thousand cubic metres per day as the Canada Energy Regulator publishes it (one thousand cubic metres is about 6,290 barrels). Enbridge's Mainline is measured at Gretna, Manitoba, where it crosses into the United States, and includes a small volume of US crude that joins the line in Saskatchewan. Trans Mountain is the sum of its deliveries at Burnaby, Westridge and Sumas. Keystone is measured at the border near Haskett, Manitoba, from July 2010. Capacity and utilization are left out for all three lines. Keystone and Enbridge at Gretna do publish capacity at the points charted, but Trans Mountain publishes its capacity only for the system as a whole, on a row with no throughput (143.0 thousand m³/d available in June 2026, against 137.6 delivered), so its delivery points carry no capacity of their own and the three lines could not be compared on one basis.
More in Economy
BoC Energy Commodity Price Index
Bank of Canada's energy commodity price index tracking oil, gas, and coal prices over 20 years.
BoC All Commodities Index
Broad commodity price index from Bank of Canada covering energy, metals, agriculture, and forestry.
Energy Price vs CAD/USD
Dual-axis comparison of energy commodity prices against the Canadian dollar exchange rate.
Non-Energy Commodity Index
Bank of Canada index for non-energy commodities — agriculture, metals, forestry.
Alberta Mining/Oil & Gas GDP
GDP contribution from Alberta's mining, oil, and gas extraction sector over time.
Alberta Construction GDP
GDP contribution from Alberta's construction sector — a leading indicator of economic expansion.
Powered by Tamrack — live Alberta data from government sources