Enbridge Mainline — Share of Requested Volume Not Accepted
Each month, the share of the oil that shippers asked to move on Enbridge's Canadian Mainline that Enbridge did not accept because the system was full, computed from the original and accepted nominations Enbridge reports to the Canada Energy Regulator. Starts in January 2016, the first month both figures are published. Shippers often request more space than they expect to use, so a high figure means demand for space was heavy, not that the line ran near empty. It is a whole-system figure: cuts on individual lines can be deeper. For January to September 2017 CER also published its own percentage for the system, and it ran higher — 33% against 18% for January 2017.
More in Economy
BoC Energy Commodity Price Index
Bank of Canada's energy commodity price index tracking oil, gas, and coal prices over 20 years.
BoC All Commodities Index
Broad commodity price index from Bank of Canada covering energy, metals, agriculture, and forestry.
Energy Price vs CAD/USD
Dual-axis comparison of energy commodity prices against the Canadian dollar exchange rate.
Non-Energy Commodity Index
Bank of Canada index for non-energy commodities — agriculture, metals, forestry.
Alberta Mining/Oil & Gas GDP
GDP contribution from Alberta's mining, oil, and gas extraction sector over time.
Alberta Construction GDP
GDP contribution from Alberta's construction sector — a leading indicator of economic expansion.
Powered by Tamrack — live Alberta data from government sources